During some work at the place the PC had been switched off.
The "Hammer" is running nicely again since Christmas.
It is running on 10MHz and 500kHz as before. Possibly with an extension in a few months. Some antenna work and some soldering needed.
Next band will probably be 80 (3500kHz). and a simpler receiver for 10MHz. The original receiver will then be set to yet another band. Some wideband antenna work will be necessary for this to work out.
Time to get the soldering iron warmed up again.
On the PA9QV front the next soldering project should be the FA-SDR. All components including the housing have arrived, only a PA (1W) is missing yet. I may build a small wideband PA myself.
Still a lot of kits to build, but slowly getting started again.
The TW-100 "Fly Away Transceiver" --- A CW-SSB Rig I Never Heard of Until
Today
-
*I was listening to the Old Military Radio Net this morning. Rhett KB4HG
checked in on Upper Sideband. He was using a loaner TransWorld TW-100 "Fly
Away...
1 day ago
No comments:
Post a Comment